Daycare RecordChild care inspection records

YMCA afterschool at IDEA Horizon Vista

201 Horizon Blvd, Socorro, TX 79927 · El Paso County

YMCA afterschool at IDEA Horizon Vista is a licensed child care center in Socorro, TX, licensed for up to 40 children and serving school-age children. It has held its Texas license since 2022. Since October 2021, state inspectors have visited 7 times. Inspectors recorded 10 citations, 1 of them high-risk, most often for records & paperwork (4 of 10). None of them came in the last 12 months. 10% were corrected during the inspection itself. Measured by risk-weighted citations per inspection, it is #8 of 8 centers in Socorro and better than 25% of licensed centers statewide.

Inspection record

Better than 25%of 9,147 Texas licensed centers, comparing risk-weighted citations per inspection. More citations than most
#8 of 8 centers in Socorro
1High risk
3Medium High risk
5Medium risk
1Medium Low risk
0Low risk
10 citations from 7 inspections and 0 reports since Oct 1, 2021 · 0 in the last 12 months · last inspected Jan 8, 2026

Every state visit

20222023202420252026INSPECTIONS (top) · REPORTS & INVESTIGATIONS (bottom)Jan 8, 2026 · Inspection · no citationJan 27, 2025 · Inspection · citation foundFeb 22, 2024 · Inspection · citation foundMar 21, 2023 · Inspection · citation foundSep 12, 2022 · Inspection · citation foundJan 28, 2022 · Inspection · citation foundNov 4, 2021 · Inspection · citation found
Citation foundNo citation

What inspectors cited most

Records & paperwork4
Staff ratios2
Training & qualifications2
Building & playground safety1
Other standards1

Citations, newest first

MediumJan 27, 2025InspectionStaff ratios
Written Operational Policies - Procedures parents access minimum standards online, TX A/N hotline, and HHSC website §744.501(20)
Operational policies were not available for review.
Correction verified Jan 28, 2025
MediumJan 27, 2025InspectionRecords & paperwork
Posting Requirements-License §744.401(1)
Operation's license was not posted.
Correction verified Jan 29, 2025
MediumFeb 22, 2024InspectionRecords & paperwork
Posting Requirements- Letter or form from the most recent licensing inspection or investigation. §744.401(2)
The most recent licensing report was not posted.
Correction verified Feb 29, 2024
MediumFeb 22, 2024InspectionRecords & paperwork
Required Personnel Records- Photo Identification §744.901(8)
Personnel file was missing a photo ID.
Correction verified Feb 29, 2024
Medium HighMar 21, 2023InspectionBuilding & playground safety
Fire Drill Monthly - Exit in 3 Minutes §744.3559(1)
A fire drill had not been conducted since 2022.
Corrected during the visit
Medium HighMar 21, 2023InspectionTraining & qualifications
Report Change in Director §744.303(4)
Inspector was not notified of site director change within five days.
Correction verified Mar 22, 2023
Medium LowSep 12, 2022InspectionTraining & qualifications
Required Records Storage - Training Records §744.803(b)
Training records for a staff and program director were not available for review during inspection.
Correction verified Oct 6, 2022
MediumJan 28, 2022InspectionRecords & paperwork
Posting Requirements- Letter or form from the most recent licensing inspection or investigation. §744.401(2)
The most recent licensing inspection report was not posted.
Correction verified Feb 2, 2022
Medium HighNov 4, 2021InspectionOther standards
Complying with Laws and Rules §744.201(9)
Centralized background check unit has not been sent needed information for site director in order to deem her as eligible to be present at the operation.
Correction verified Nov 18, 2021
HighNov 4, 2021InspectionStaff ratios
AP Background check results - Must receive notification prior to allowing subject to be present at your operation §745.641
Site director currently has an inactive background check status and is ineligible to be present at the operation; however, the site director was present and in charge at the operation during this inspection.
Correction verified Nov 18, 2021

About this center

Licensed capacity40 children
Ages servedSchool
Hours03:30 PM-06:00 PM
DaysMon, Tue, Wed, Thu, Fri
Licensed sinceMar 14, 2022
Director—
Phone9155909622
State operation #1711812- 10671

Common questions

Does YMCA afterschool at IDEA Horizon Vista take infants?

No. Its Texas license covers school-age children, not infants.

What are YMCA afterschool at IDEA Horizon Vista’s hours?

3:30 PM to 6 PM, Monday through Friday, according to its state licensing record. Confirm holiday and summer hours with the center.

Does YMCA afterschool at IDEA Horizon Vista accept child care subsidies?

Not according to its state licensing record. Ask the center directly, since participation can change.

How much does YMCA afterschool at IDEA Horizon Vista cost?

Texas does not publish individual centers’ prices, so ask YMCA afterschool at IDEA Horizon Vista for its current tuition. For comparison, the median full-day price at licensed centers in the Borderplex area, which includes Socorro, is $28.00 a day for school-age children (2025 Texas Child Care Market Rate Survey).

Has YMCA afterschool at IDEA Horizon Vista had any serious violations?

Inspectors recorded 1 high-risk citation since 2021. The most recent was on Nov 4, 2021: “AP Background check results - Must receive notification prior to allowing subject to be present at your operation.” Each one is listed in full above.

How does YMCA afterschool at IDEA Horizon Vista compare with other daycares in Socorro?

It is #8 of 8 centers in Socorro by risk-weighted citations per inspection, and is better than 25% of licensed centers statewide (out of 9,147 Texas centers with enough inspection history).

When was YMCA afterschool at IDEA Horizon Vista last inspected?

Jan 8, 2026. No violations were found during that visit.

Licensed centers nearby

Citations are quoted from Texas HHS inspection records. Many are corrected the same day, and a citation is a finding about one rule, not a judgment about a center overall.

To see the official record, search operation 1711812- 10671 on Search Texas Child Care. Data refreshed Sep 30, 2026.